...
【24h】

Power Briefs

机译:电源简介

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The callaway-2 col application has been withdrawn by Ameren Missouri. The company had originally proposed an Areva U.S. EPR pressurized water reactor as the second reactor at the Callaway site near Fulton, Mo., but less than a year after the July 2008 submittal of the combined operating license application, Ameren suspended the project. Since then, Ameren proposed to switch to an early site permit, and then shelved the U.S. EPR in favor of a joint venture with Westinghouse Electric Company to develop the Westinghouse Small Modular Reactor; this ended when Westinghouse halted work on its SMR in 2014. In late September, the Nuclear Regulatory Commission posted Ameren's August 12 withdrawal letter online. Technically, the application is not deemed to be withdrawn until the NRC has given its approval, but Ameren considers the project to be ended.
机译:Callaway-2 col申请已被Ameren Missouri撤回。该公司最初提议在密苏里州富尔顿附近的Callaway基地将阿海珐美国EPR压水堆作为第二个反应堆,但在2008年7月提交合并运行许可证申请后不到一年,Ameren暂停了该项目。从那以后,Ameren建议改用早期的现场许可证,然后搁置美国EPR,转而与西屋电气公司合资兴建西屋小型模块化反应堆;当西屋公司在2014年停止其SMR工作时,这一工作就结束了。9月下旬,核监管委员会在线发布了Ameren 8月12日的撤回信。从技术上讲,直到NRC批准该申请后,该申请才被视为撤回,但Ameren认为该项目将被终止。

著录项

  • 来源
    《Nuclear news》 |2015年第12期|36-36|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号