首页> 外文期刊>The nuclear review >Armenia to Extend Operation of Nuclear Power Plant Until 2026
【24h】

Armenia to Extend Operation of Nuclear Power Plant Until 2026

机译:亚美尼亚将延长核电厂的运作,直到2026年

获取原文
获取原文并翻译 | 示例
           

摘要

Armenia plans to extend the operatinglicense for its sole nuclear powerplant-Unit 2 (375 MWe PWR) at theplant in Metsamor-until 2026, and isstill considering plans for a new plantto replace the existing facility that hasbeen in service for 40 years.Armenia’s State Nuclear SafetyRegulatory Committee will extend thelicense for Unit 2 after the successfulimplementation of all activitiesplanned for this year, Plant CEO EduardMartirosyan said, according to mediareports. (Unit 1 was shut down in1989.) Russia's Rosatom Service JSC,which is contracted by the Armeniangovernment to upgrade the plant,said this year's maintenance outagefor the plant will be extended to 141days to complete the remaining workfor modernization, which includesannealing of the reactor vessel.
机译:亚美尼亚计划延长运营唯一核电的许可证植物单元2(375 MWE PWR)植物在metsamor - 直到2026年,是仍在考虑计划新工厂的计划替换现有的设施服务于40年。亚美尼亚的国家核安全监管委员会将延长成功后的单位2的许可证实施所有活动计划今年,植物首席执行官EduardMartirosyan说,媒体介绍报告。 (单元1被关闭1989年。)俄罗斯的ROSATOM服务JSC,由亚美尼亚签约政府升级工厂,说今年的维护中断对于工厂将扩展到141要完成剩余工作的日子用于现代化,包括反应器容器的退火。

著录项

  • 来源
    《The nuclear review》 |2021年第29期|5-5|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号