...
首页> 外文期刊>The nuclear review >BHP Reports Lower Production at Olympic Dam in September Quarter,Shelves Olympic Dam Expansion
【24h】

BHP Reports Lower Production at Olympic Dam in September Quarter,Shelves Olympic Dam Expansion

机译:BHP在9月季度报告奥林匹克大坝的产量降低,货架奥运大坝扩建

获取原文
获取原文并翻译 | 示例
           

摘要

Global miner BHP reported uranium production of 874 tU_3O_8(1.93 million pounds U_3O_8) for its first quarter ended September 30, down 7 percent from the same period a year ago and down 14 percent form the previous quarter. The company reported higher uranium sales of 859 tU_3O_8 (1.89 million pounds U_3O_8) for the first quarter of Fiscal Year 2021, 10 percent higher than sales during the previous quarter at 759 tU_3O_8 (1.67 million pounds U_3O_8) (Figure 1).
机译:全球矿工BHP报告铀生产874 TU_3O_8(19303万英镑U_3O_8)截至9月30日的第一季度,从一年前的同一时期下降了7%,上一个季度的下降了14%。本公司报告了2021财年第一季度的铀销售额为859吨_3O_8(1890万英镑U_3O_8),比上一季度的销售额高10%,在759 TU_3O_8(1.67亿英镑U_3O_8)(图1)。

著录项

  • 来源
    《The nuclear review》 |2020年第23期|4-5|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号