首页> 外文期刊>Nuclear fusion >Steady-state tokamak operation, ITB transition and sustainment and ECCD experiments in TRIAM-1M
【24h】

Steady-state tokamak operation, ITB transition and sustainment and ECCD experiments in TRIAM-1M

机译:TRIAM-1M中的稳态托卡马克运行,ITB过渡和维持以及ECCD实验

获取原文
获取原文并翻译 | 示例
       

摘要

Experiments aiming at 'day long operation at high performance' have been carried out in TRIAM-1M. The record value of the discharge duration was updated to 5h and 16min. Steady-state tokamak operation is studied under the localized plasma wall interaction conditions. The distributions of the heat load, the particle recycling flux and impurity source are investigated to understand the co-deposition and wall pumping. The formation and sustainment of an internal transport barrier (ITB) in enhanced current drive mode has been investigated by controlling the lower hybrid driven current profile by changing the phase spectrum. An ITER relevant remote steering antenna for electron cyclotron wave injection was installed and a relativistic Doppler resonance of the oblique propagating extraordinary wave with energetic electrons driven by lower hybrid waves was studied.
机译:在TRIAM-1M中进行了旨在“高性能的全天运行”的实验。放电持续时间的记录值更新为5h和16min。在局部等离子体壁相互作用条件下研究了稳态托卡马克操作。研究了热负荷,颗粒再循环通量和杂质源的分布,以了解共沉积和壁泵送。通过改变相谱来控制较低的混合驱动电流分布,已经研究了增强电流驱动模式下内部传输势垒(ITB)的形成和维持。安装了用于电子回旋波注入的ITER相关远程操纵天线,并研究了由低杂波驱动的高能电子对斜传播的超常波的相对论多普勒共振。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号