Berkeley was commissioned in 1962 and operated until 1989. Its decommissioning began with the removal of fuel from the reactors. The de-fueling was finished in March 1992 and various activities followed, including removal of the gas ducts, boilers, non-active ancillary plant, asbestos and refurbishment of the reactor buildings. The cooling ponds were formally used for the storage of irradiated fuel elements prior to their despatch for reprocessing. Phase 1 was carried out by Jordan Engineering between June 1994 and April 1996. In this initial phase, redundant plant and equipment were removed, as well as loose and near surface contamination within the pond tanks to a depth of 2mm. Following drainage of the ponds, ultra high pressure water jetting was applied using a remotely operated arm to traverse the pond walls and remove the pond tank coating.
机译:伯克利(Berkeley)于1962年投入使用,直到1989年才开始运行。其停运工作始于从反应堆中清除燃料。加油工作已于1992年3月完成,随后进行了各种活动,包括拆除煤气管道,锅炉,不活跃的辅助设备,石棉和对反应堆厂房进行翻新。冷却池在发送给后处理的燃料之前,已正式用于存储受辐照的燃料元件。第一阶段在1994年6月至1996年4月期间由约旦工程公司执行。在此初始阶段,去除了多余的工厂和设备,以及池塘水箱内深度达2mm的疏松和近地面污染。池塘排水后,使用远程操作臂施加超高压水喷射以横穿池塘壁并去除池塘水箱的涂层。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号