【24h】

PIK of the bunch

机译:一堆的PIK

获取原文
获取原文并翻译 | 示例
       

摘要

In 2001 Russia's Nuclear Energy Ministry (Minatom), the Ministry of Industry, Science, and Technologies, and Presidium of the Russian Academy of Sciences provided R199 million ($7 million) to continue construction of the PIK research reactor at the St Petersburg Nuclear Physics Institute (PNPI) in Gatchina. Although the sum was only 61.66% of what was allocated for 2001, it has enabled work to resume on the project which had an initial cost estimated at 1150 million, according to PNPI centre director Vladimir Nazarenko. He says the reactor is 80% ready and only about $35 million worth of work remains to be done. Construction began in 1976 but was repeatedly suspended due to the lack of finances. So far, construction of the research complex has cost $150 million. The aim is to begin operation in 2003, provided the project is financed properly. The reactor will be used for fundamental studies of solid bodies, particle interaction, and other problems of nuclear physics, radiation chemistry; and biology. The reactor's physical parameters and test capacities arc such that it could become the centre of an international centre for neutron research.
机译:2001年,俄罗斯核能部(Minatom),工业,科学和技术部以及俄罗斯科学院主席团提供了1.99亿兰特(700万美元),以继续在圣彼得堡核物理研究所建造PIK研究堆(PNPI)在Gatchina。 PNPI中心主任弗拉基米尔·纳扎连科(Vladimir Nazarenko)表示,尽管这笔款项仅是2001年拨款的61.66%,但它使该项目的工作得以恢复,该项目的初始成本估计为11.5亿美元。他说,该反应堆已准备就绪,已完成80%的工作,仅需完成约3500万美元的工作。建造于1976年开始,但由于缺乏资金而屡次中止。到目前为止,该研究中心的建设已经花费了1.5亿美元。目标是在适当资助的情况下于2003年开始运营。该反应堆将用于固体,颗粒相互作用以及核物理,辐射化学等其他问题的基础研究。和生物学。反应堆的物理参数和测试能力使其可以成为国际中子研究中心的中心。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号