Canada's new generation

机译:加拿大的新一代

获取原文
获取原文并翻译 | 示例
       

摘要

It is a topic with a vast array of contentious arguments, but the facts do not lie and, by just looking at the State of Ontario's future energy needs, the key issues become starkly apparent. Ontario's grid manager, the Independent Market Operator (IMO), has called for 15GW of electricity over the next 15 years, including replacement and refurbishment of existing plants. This represents roughly half of Ontario's generation capacity. It is a tough challenge and many feel the enthusiasm of the private sector to make investments has been dimmed after the government announced a price freeze in the state last November. It has short-circuited the investment incentive, which many believe will lead to worsening supply shortages. The blackout also gave rise to outbursts from many dramatically opposed to nuclear generation, but it is apparent from developments thus far that the cause of the blackouts had nothing to do with the existence of nuclear plants. And according to Steve Cannon, a spokesman for Bruce Power: "Within hours of the electricity grid tripping on 14 August, three of the four operating units at the Bruce B generating plant had regained power and were dispatching electricity to the Ontario grid at the request of the IMO."
机译:这是一个充满争议的话题,但事实并不存在,仅通过查看安大略省未来的能源需求,关键问题就显而易见了。安大略省的电网经理独立市场运营商(IMO)呼吁在未来15年内提供15GW的电力,其中包括对现有工厂的更换和翻新。这大约占安大略省发电量的一半。这是一个艰巨的挑战,在政府于去年11月宣布冻结该州的价格后,许多人感到私营部门进行投资的热情已经减弱。它使投资动机短路,许多人认为这将导致供应短缺加剧。停电事故也引起了许多与核能发电截然相反的事件的爆发,但从迄今为止的事态发展来看,停电的原因显然与核电站的存在无关。根据布鲁斯动力公司的发言人史蒂夫·坎农的说法:“在8月14日电网中断数小时内,布鲁斯B发电厂的四个运行单元中的三个已经恢复供电,并应要求将电力分配到安大略省电网IMO。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号