【24h】

To Yucca from plant

机译:从工厂到丝兰

获取原文
获取原文并翻译 | 示例
           

摘要

The 25-year transportation programme to move spent fuel from commercial reactors around the USA to a proposed repository at Yucca Mountain, Nevada, will not be simple matter of loading casks on a fleet of trucks and driving to the desert. Even if the repository programme were running smoothly, which it most definitely is not, transportation issues would require millions of dollars and years of effort before the first cask ever hits the roads - or the rails. Among the big ticket items are a new railroad spur to the proposed repository site, full-scale crash and fire testing of typical spent fuel casks, and then procurement of an entire fleet of existing and custom designed casks.
机译:这项为期25年的运输计划将乏燃料从美国各地的商业反应堆运至内华达州尤卡山的拟议中的储存库,这并不是简单的将桶装满卡车并驶向沙漠的问题。即使存储库程序运行顺利(这绝对不是这样),运输问题仍需要数百万美元和数年的努力才能使第一个桶运到公路或铁轨上。大型票据项目包括拟建仓库地点的新铁路支线,典型乏燃料桶的全面碰撞和火灾测试,然后采购整个现有和定制设计的桶。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号