首页> 外文期刊>Nuclear Engineering International >As Kayelekera uranium mine ramps up,Areva signs mining deal with Congo
【24h】

As Kayelekera uranium mine ramps up,Areva signs mining deal with Congo

机译:随着Kayelekera铀矿的增加,Areva与刚果签署了采矿协议

获取原文
获取原文并翻译 | 示例
       

摘要

Dr Bingu wa Mutharika has officially opened Paladin Energy's Kayelekera uranium mine in the republic of Malawi. The project, about 40km west of Karonga, has been commissioned, is producing yellowcake, and ramping up to full production levels. A GRD Minproc feasibility study from 2007 estimates that the mine would produce an average of 1493t U_3O_8 for its first seven years from a a feedrngrade of 0.109% U_3O_8, based on an annual production rate of 1.5Mt/y and 90% recovery. It would produce 530t/y U_3O_8 over the last four years using accumulated marginal material grading 0.039% U_3O_8.
机译:Bingu wa Mutharika博士已在马拉维共和国正式开放Paladin Energy的Kayelekera铀矿。该项目位于卡隆加(Karonga)以西约40公里处,已经投产,正在生产黄蛋糕,并逐步达到满负荷生产水平。从2007年开始的GRD Minproc可行性研究估计,以年产量1.5Mt / y和90%的回收率计算,该矿在最初的7年中将以0.109%U_3O_8的饲料等级平均生产1493t U_3O_8。在过去的四年中,使用累积边际材料等级为0.039%U_3O_8的话,它将产生530t / y U_3O_8。

著录项

  • 来源
    《Nuclear Engineering International》 |2009年第658期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:49:44

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号