首页> 外文期刊>Nuclear Engineering International >Load factors to end September 2009
【24h】

Load factors to end September 2009

机译:负载系数到2009年9月

获取原文
获取原文并翻译 | 示例
       

摘要

Two reactors entered their 40th year of operation in the quarterrnto end of September 2009: Beznau 1, a 380MW BWR operat-rned by NOK Axpo in Switzerland and Oyster Creek, a 680MWrn BWR operated by Exelon in the USA. Despite their ages, bothrnunits continue to perform well with average annual load factors of 90.1 %rnand 77.3%, respectively - both well above the BWR average of 71.4% forrnthe year to end of September 2009.rnAs of September, there were six reactors that had been operating for over forty years. The others: Tarapur 1 & 2 (GE-designed BWRs) in India and the two Magnox units at Oldbury in the UK, which, after operating for almost 42 years, remain the oldest reactors listed in our table! Still, with another four US plants and others elsewhere due to reach the forty-year-milestone by September 2010 this quarter signifies the start of a new era where life above 40 is becoming a reality.
机译:2009年9月底至季度末,有两个反应堆进入运行40年:Beznau 1,由瑞士NOK Axpo经营的380MW BWR,以及Oyster Creek,由Exelon在美国经营的680MWrn BWR。尽管有年龄,这两个反应堆仍继续表现良好,平均年负荷率分别为90.1%和77.3%-均远高于截至2009年9月的一年的BWR平均水平71.4%。截至9月,共有6个反应堆已有40多年的历史了。其他的:印度的Tarapur 1和2(由GE设计的BWR)和英国Oldbury的两个Magnox装置,在运行了将近42年之后,它们仍然是我们表中列出的最古老的反应堆!尽管如此,到2010年9月,另外四家美国工厂和其他地方的工厂将达到40年的里程碑,这一季度标志着一个新时代的开始,在40岁以上的生活正在成为现实。

著录项

  • 来源
    《Nuclear Engineering International》 |2010年第667期|p.30-35|共6页
  • 作者

    Caroline Peachey;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:49:13

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号