首页> 外文期刊>Nuclear Engineering International >Load factors to end March 2011
【24h】

Load factors to end March 2011

机译:负载系数截至2011年3月

获取原文
获取原文并翻译 | 示例
       

摘要

Reactor performance improved in the 12 months to end of March 2011 despite the huge earthquake that struck off the coast of Japan on 11 March 2011, impacting the operation of reactors in Japan and elsewhere. Data were available for 409 reactors with more than a year's operating experience on 31 March 2011 (see Table 2). Between them they generated around 2650 TWh of electricity, achieving an average load factor of 78.4%, 33 basis points higher than for the same period in 2010. The average lifetime load factor for the 12 months to end of March 2011-72.7%-again represents a slight improvement over the 72.1% achieved for the same period last year. As usual, during the 12 months ending 31 March 2011 PWRs outperformed BWRs. The average load factor for PWRs was 82.4%, an improvement of 37 basis points over the figure achieved for the same period in 2010.
机译:尽管2011年3月11日发生在日本沿海的大地震影响了日本及其他地区的反应堆运行,但反应堆性能在截至2011年3月的12个月中有所改善。截至2011年3月31日,已有409年以上具有一年以上运行经验的反应堆可获得数据(见表2)。它们之间的发电量约为2650 TWh,平均负载率达到78.4%,比2010年同期高33个基点。截至2011年3月的12个月的平均寿命负载率再次达到7.2.7%较去年同期的72.1%略有改善。与往常一样,在截至2011年3月31日的12个月中,压水堆的性能优于压水堆。压水堆的平均负荷率为82.4%,比2010年同期提高了37个基点。

著录项

  • 来源
    《Nuclear Engineering International》 |2011年第687期|p.36-40|共5页
  • 作者

    Caroline Peachey;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:46:21

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号