Japanese utilities respond to the tsunami

机译:日本公用事业应对海啸

获取原文
获取原文并翻译 | 示例
       

摘要

In March, Japanese electric power utilities begun addressing and reviewing their earthquake and tsunami measures. Some of the measures that are to be undertaken by the utilities include the construction of tsunami defences and the deployment of portable power generators. Many utilities have suspended construction of new nuclear plants or have decided not to restart units undergoing maintenance until safety reviews have been completed. So far four new Japanese nuclear projects have been suspended or postponed (see Table 2, p24).
机译:3月,日本电力公司开始处理和审查其地震和海啸措施。电力公司将采取的一些措施包括海啸防御设施的建设和便携式发电机的部署。许多公用事业公司已暂停了新核电站的建设,或已决定在完成安全审查之前不重启正在维护的机组。迄今为止,日本有四个新的核项目被暂停或推迟(见表2,第24页)。

著录项

  • 来源
    《Nuclear Engineering International》 |2011年第683期|p.23|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:46:20

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号