The continued pressure from decreased demand as a result of the accident at the Fukushima site in Japan was counter-balanced by the extended shutdown of a primary converter's conversion capacity. Existing facilities are ageing, but several converters are moving forward with investments at both existing and new facilities, providing confidence that both current and future new demand can be met reliably. The Honeywell International Metropolis Works uranium conversion facility in Metropolis, Illinois, which shut down production in mid-2012 to address facility upgrades required by the US Nuclear Regulatory Commission (NRC), was given permission to restart in July 2013 after extensive upgrades. Cameco Corporation was also granted regulatory approval to expand UO~3 production capacity at its Blind River refinery as well as a new 10-year operating licence for the facility.
机译:由于日本福岛核电站事故造成的需求下降所带来的持续压力,被一次转换器的转换能力的长期关闭所抵消。现有设施正在老化,但是一些转炉正在利用现有设施和新设施进行投资,这使人们确信可以可靠地满足当前和未来的新需求。位于伊利诺伊州大都会市的霍尼韦尔国际大都会工厂铀转化设施于2012年中停产,以应对美国核监管委员会(NRC)要求的设施升级,并经过大规模升级后,于2013年7月获准重启。 Cameco Corporation还获得了监管部门的批准,以扩大其Blind River炼油厂的UO〜3生产能力,并获得该设施的新10年运营许可证。

著录项

  • 来源
    《Nuclear Engineering International》 |2013年第710期|20-23|共4页
  • 作者

    Eileen Supko; Thomas Meade;

  • 作者单位

    Energy Resources International, Inc, 1015 18th Street, NW, Suite 650, Washington, DC 20036, USA;

    Energy Resources International, Inc, 1015 18th Street, NW, Suite 650, Washington, DC 20036, USA;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号