首页> 外文期刊>Nuclear Engineering International >The impact of FLEX on outage risk
【24h】

The impact of FLEX on outage risk

机译:FLEX对停电风险的影响

获取原文
获取原文并翻译 | 示例
       

摘要

Following the Fukushima Daiichi accident, the US Nuclear Regulatory Commission (NRC) issued order ES-12-049 [1] requiring nuclear plants in the US to implement mitigation strategies to cope with a beyond-design-basis external event. The event is assumed to result in an extended loss of all AC power and loss of access to the ultimate heat sink for all units on the site, with no expectation of either returning. The initial phase requires installed equipment and on-site resources to be used to maintain or restore cooling capability for the core, containment and spent fuel pool (SFP). The transition phase requires the use of portable onsite equipment to provide sufficient cooling for these functions. The final phase requires the use of offsite resources to sustain these functions indefinitely.
机译:福岛第一核电站事故后,美国核监管委员会(NRC)发布了ES-12-049 [1]号命令,要求美国的核电厂实施缓解策略以应对超出设计基准的外部事件。假定该事件将导致所有交流电源的扩展损耗以及该站点上所有设备无法访问最终散热器的情况,并且预计两者均不会返回。初始阶段需要使用已安装的设备和现场资源来维护或恢复堆芯,安全壳和乏燃料池(SFP)的冷却能力。过渡阶段需要使用便携式现场设备为这些功能提供足够的冷却。最后阶段需要使用场外资源来无限期地维持这些功能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号