Following up on work underway when the Fukushima accident highlighted the importance of seismic issues in the nuclear arena, the US Nuclear Regulatory Commission has set a priority list for 21 of 59 nuclear power plant sites in the central and eastern United States to conduct in-depth analyses of the plants' earthquake risk. A detailed risk analysis is due by 30 June 2017 from these plants: Callaway, Cook, Indian Point, North Anna, Oconee, Peach Bottom, Pilgrim, Robinson, Vogtle and Watts Bar. That report is due from the following plants by 31 December 2019: Beaver Valley, Browns Ferry, Catawba, Dresden, Fermi, Hatch, LaSalle, Oyster Creek, Palisades, Summer and Sequoyah.
机译:在福岛事故突显出核领域地震问题的重要性时正在进行的工作之后,美国核监管委员会为美国中部和东部59个核电厂站点中的21个站点设定了优先清单,以进行深入调查。分析工厂的地震风险。到2017年6月30日,以下工厂将进行详细的风险分析:卡拉威,库克,印第安角,北安娜,奥科尼,桃底,朝圣者,鲁滨逊,Vogtle和Watts Bar。该报告将在2019年12月31日之前从以下工厂发布:海狸谷,布朗斯渡轮,卡托巴,德累斯顿,费米,哈奇,拉萨尔,牡蛎溪,帕利塞兹,萨默斯和红杉。

著录项

  • 来源
    《Nuclear Engineering International》 |2014年第719期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:44:46

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号