首页> 外文期刊>Nuclear Engineering International >Load factors to end December 2013
【24h】

Load factors to end December 2013

机译:负载系数截至2013年12月

获取原文
获取原文并翻译 | 示例
       

摘要

The 400 nuclear reactor units (374.2 GW) with data available for the full year 2013 generated a total of 2346 TWh of electricity. This was up very slightly (1.2%) on the 2012 figures, but continues to be much lower than the 2500 TWh of nuclear electricity generated in 2011. Together they generated a total of 66,074 TWh during 11,501 years of operation, achieving a mean average lifetime load factor of 72.8, which is about the same as the last few years. In 2013, there were more reactors operating in the three highest percentile brackets (85% load factor and above, as shown in Figure 7) than in 2012, suggesting normality is returning after Fukushima. The most significant trend was the increase in units with load factors of 95% or above, 53 compared with 41 last year.
机译:具有2013年全年可用数据的400个核反应堆机组(374.2 GW)产生了总计2346 TWh的电力。这比2012年的数字略有上升(1.2%),但仍远低于2011年产生的2500 TWh核电。它们在11,501年的运行期间总计产生了66,074 TWh的电能,实现了平均平​​均寿命负载系数为72.8,与最近几年相同。 2013年,在三个百分比最高的支架(85%或更高的负载系数,如图7所示)中运行的反应堆比2012年更多,这表明福岛核电站之后恢复了正常状态。最显着的趋势是负荷系数达到或超过95%的装置数量增加了53,而去年为41。

著录项

  • 来源
    《Nuclear Engineering International》 |2014年第718期|26-32|共7页
  • 作者

    Will Dalrymple;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:44:49

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号