Decommissioning operations on the SGHWR Stage 1 contract at UKAEA Winfrith, funded by the Nuclear Decommissioning Authority (NDA), are almost complete with waste packing still in progress. A wide-range of decommissioning techniques have been utilised throughout this project and several examples, involving both hot and cold cutting, have been mentioned in the context of dismantling large and heavy plant items. The development of multiple work fronts has contributed to the success of the project as well as a dedicated waste handling team which has processed over 2600Te of waste in support of the overall project tasks.
机译:由核退役管理局(NDA)资助的UKAEA Winfrith的SGHWR第1阶段合同的退役工作几乎已经完成,废物包装工作仍在进行中。在整个项目中,已经采用了广泛的退役技术,并且在拆除大型和重型植物项目时提到了一些涉及热切割和冷切割的示例。多个工作前沿的发展为该项目的成功做出了贡献,并且有专门的废物处理团队处理了超过2600Te的废物,以支持整个项目任务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号