首页> 外文期刊>Nuclear future >Pre-construction safety reports and dealing with the unknown
【24h】

Pre-construction safety reports and dealing with the unknown

机译:施工前安全报告和应对未知事件

获取原文
获取原文并翻译 | 示例
           

摘要

This paper considers and classifies, as far as possible, the various types of 'unknown' faced during the production of a PCSR. Given that the scope of the unknowns is far greater than that of the knowns at the start of the project, the paper considers some of the techniques used to proceed with a safety justification. The last word goes to Rumsfeld (from his autobiography): "Those who made the decisions with imperfect knowledge will be judged in hindsight by those with considerably more information at their disposal and time for reflection."
机译:本文尽可能地考虑和分类PCSR生产过程中面临的各种“未知”类型。考虑到未知数的范围远大于项目开始时的已知数,本文考虑了一些用于进行安全论证的技术。最后一句话是拉姆斯菲尔德(来自他的自传):“那些知识不完善的人将被事后判断,那些掌握了更多信息并有时间思考的人会被事后判断。”

著录项

  • 来源
    《Nuclear future》 |2014年第5期|40-43|共4页
  • 作者

    Jenny Brain;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号