首页> 外文期刊>Nuclear Energy >The regulation of the commissioning of the Sizewell B nuclear power station
【24h】

The regulation of the commissioning of the Sizewell B nuclear power station

机译:Sizewell B核电站调试的规定

获取原文
获取原文并翻译 | 示例
       

摘要

This paper describes the regulatory aspects of the control of the commissioning of Sizewell B. The way in which the legislation has been used in dealing with commissioning and the early phases of operation is also discussed, with particular emphasis on the manner in which it has been applied to control all aspects of nuclear safety during the transition from a construction to an operational power station.
机译:本文描述了Sizewell B调试控制的监管方面。还讨论了立法用于调试和运营的早期阶段的方式,尤其着重于已被采用的方式。用于控制从建筑到运营电站过渡期间核安全的各个方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号