首页> 外文期刊>Nuclear Energy >A technical tour of Heysham 2
【24h】

A technical tour of Heysham 2

机译:Heysham 2技术之旅

获取原文
获取原文并翻译 | 示例
           

摘要

We received a warm welcome and an informative overview of the operation of an AGR as well as an overview of EDF Energy as an organisation. Heysham 1 and 2 are two of the seven AGR power stations operated by EDF Energy along with the PWR at Sizewell B. Heysham 1 was built in the 1970s at a cost of £600 million and Heysham 2 was later constructed in the 1980s (consisting of Reactors 7 and 8) at a cost of £1.6 billion. Heysham 1 will remain operational until 2024 and Heysham 2 until 2030.
机译:我们受到了热烈的欢迎,并对AGR的运营以及EDF Energy作为一个组织的概述提供了内容丰富的概述。 Heysham 1和Heysham 2是EDF能源公司与Sizewell B的压水堆一起运营的七个AGR电站中的两个.Heysham 1建于1970年代,耗资6亿英镑,Heysham 2后来于1980年代建造(由反应堆7和8),耗资16亿英镑。 Heysham 1将一直运行到2024年,Heysham 2将一直运行到2030年。

著录项

  • 来源
    《Nuclear Energy》 |2020年第1期|32-32|共1页
  • 作者

    Celia Wighton;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号