首页> 外文期刊>NKK Technical Review >Horizontal Directional Drilling Method for Pipeline Crossing (NK-RAPID)
【24h】

Horizontal Directional Drilling Method for Pipeline Crossing (NK-RAPID)

机译:管道穿越水平定向钻井方法(NK-RAPID)

获取原文
获取原文并翻译 | 示例
           

摘要

Horizontal directional drilling (HDD) of a pipeline crossing is done by drilling an arched hole from the ground surface along a specified path beneath obstructions, followed by pulling the pipeline through the hole. The HDD method was introduced to NKK from the Cherrington Corporation in the USA under a technical transfer agreement. NKK named this method "NK-RAPID " and used it for a pipeline crossing in Hong Kong. This paper presents an outline of NK-RAPID and the Hong Kong project undertaken by NKK.
机译:管道交叉口的水平定向钻探(HDD)是通过沿障碍物下方的指定路径从地面钻一个拱形孔,然后将管道拉出该孔来完成的。根据技术转让协议,HDD方法是由美国Cherrington公司引入NKK的。 NKK将这种方法命名为“ NK-RAPID”,并将其用于香港的管道穿越。本文概述了NK-RAPID和NKK承担的香港项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号