...
首页> 外文期刊>NKK Technical Review >Design and Construction of Refuse Bunker Using Pneumatic Caisson Method
【24h】

Design and Construction of Refuse Bunker Using Pneumatic Caisson Method

机译:气动沉箱法设计垃圾掩体

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

NKK contracted with Ichinomiya City on a full turnkey basis to provide a refuse incineration plant in Aichi Prefecture. The pneumatic caisson method was adopted for the construction of the refuse bun- ker for this plant. This is NKK's first challenge to adopt this method for refuse bunker construction, And there are only two other cases in Japan. This case is the largest size construction of a pneumatic Caisson refuse bunker in Japan. The dimensions of the bunker are 49.2 long by 27.7 wide by 15. Om High.
机译:NKK与一宫市签订了全面的总承包合同,在爱知县提供垃圾焚烧厂。该工厂采用了气动沉箱法建造垃圾掩体。这是NKK在垃圾掩体建造中采用这种方法的第一个挑战,而且在日本只有另外两种情况。此案例是日本最大的Caisson气动垃圾掩体结构。掩体的尺寸为49.2长x 27.7宽x15。高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号