...
首页> 外文期刊>NKK技報 >Design and Construction of Refuse Bunker Using Pneumatic Caisson Method
【24h】

Design and Construction of Refuse Bunker Using Pneumatic Caisson Method

机译:气动沉箱法设计垃圾掩体

获取原文
获取原文并翻译 | 示例
           

摘要

NKK contracted with Ichinomiya City Office for refuse incinerationplant on full-turnkey basis in Aichi- Prefecture. Pneumatic caissonmethod is adopted for the construction of refuse bunker of thisplant. This is the first challenge of NKK adopt this method to therefuse bunker construction, and there are only two other cases inJapan. This case is the largest scale of construction using pneumaticcaisson method which is adopted for refuse bunker in Japan (thedimension of the bunker; l49.2 x w27.7 x h15.0m).
机译:NKK与一宫市政府签订了爱知县全程交钥匙垃圾焚烧厂的合同。该工厂垃圾掩体的建造采用气动沉箱法。这是NKK采用这种方法拒绝掩体建造的第一个挑战,而在日本只有另外两种情况。这种情况是日本在垃圾掩体中采用气动沉箱法建造的最大规模的掩体(掩体的尺寸;长49.2 x宽27.7 x高15.0m)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号