In May 2005, Stage One of the first major rail project in Auckland for 30 years was completed by Ontrack at a cost of $22.5 million. The Western Line double-tracking is a key component of a larger programme by ARTA (Auckland Regional Transport Authority) to enhance the Auckland commuter rail network. The project will be undertaken in a series of key stages chosen to minimise disruption to rail passengers whilst maintaining the necessary momentum to complete the works in as short a period as possible. Duplication from Boston Road to Morningside was achieved 3 months ahead of the original schedule and $0.7 million under budget. The Project Manager was Andrew Quinn of Arrow International Ltd.
机译:2005年5月,Ontrack完成了奥克兰30年来第一个大型铁路项目的第一阶段,耗资2250万纽元。 Western Line双轨铁路是ARTA(奥克兰地区运输局)的一项大型计划的重要组成部分,该计划旨在增强奥克兰的通勤铁路网络。该项目将分一系列关键阶段进行,以最大程度地减少对铁路乘客的干扰,同时保持必要的动力,以在尽可能短的时间内完成工程。从波士顿路到Morningside的复制比原定计划提前了3个月,预算减少了70万美元。项目经理是Arrow International Ltd.的Andrew Quinn。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号