首页> 外文期刊>New Technology Japan >Sewage Sludge and Incineration Ash Melting Facility
【24h】

Sewage Sludge and Incineration Ash Melting Facility

机译:污泥和焚烧灰渣融化设施

获取原文
获取原文并翻译 | 示例
       

摘要

This section describes selected developments of special importance or interest due to the achievement of a breakthrough or innovation in technology. In March 1996, Ebara Corp. completed the installation of a 49.2-t/hr. sewage sludge melting facility at the Maebashi Municipal Water Purification Center, Gumma Pref. This concluded the construction (started off in September 1994) of the center's new sludge melting facility, implemented in an effort to reduce effluent sludge as well as incineration ash, also for making effective use of byproducts from these waste elements. Some pressing problems facing the center-limited sewage treatment capacity (84,000m~3/d), increasing volume of generated sludge, and lack of landfill sites to bury incineration ash from the sludge incinerator-have now been eliminated.
机译:本节介绍了由于技术上的突破或创新而具有特殊重要性或兴趣的选定发展。 1996年3月,Ebara Corp.完成了49.2吨/小时的安装。 Gumma Pref前桥市水净化中心的污水污泥熔化设施。结束了该中心新污泥熔化设备的建设(于1994年9月开始),该设备旨在减少污水污泥和焚烧灰,并有效利用了这些废物元素产生的副产品。现在已经消除了一些中心问题,这些问题面临着中心限制的污水处理能力(84,000m〜3 / d),产生的污泥数量增加以及缺乏将垃圾焚烧炉灰渣掩埋的垃圾填埋场的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号