...
首页> 外文期刊>New civil engineer >Wembley contractors rip out faded seats
【24h】

Wembley contractors rip out faded seats

机译:温布利承包商拆掉褪色的座椅

获取原文
获取原文并翻译 | 示例
           

摘要

Contractors at Wembley Stadium were this week ripping out hundreds of seats for the second time in a year, because their coverings had faded in the sun even before the official opening. The stadium finally got the go-ahead to stage this year's FA Cup final last month after two successful test events. But stadium owners Wembley National Stadium Limited (WNSL) now face the embarrassment of having to replace more than 1,000 executive seats ahead of the 19 May showpiece event.
机译:温布利大球场的承包商本周第二次剥夺了数百个席位,因为甚至在正式开幕之前,它们的遮盖物就已经在阳光下褪色了。经过两次成功的测试活动,该体育场终于在上个月获得了今年足总杯决赛的批准。但是,体育场馆主温布利国家体育场有限公司(WNSL)现在面临尴尬,不得不在5月19日的演出活动之前更换1,000多个行政席位。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号