...
首页> 外文期刊>New civil engineer >Borough Viaduct & London Bridge: The keys to opening capacity
【24h】

Borough Viaduct & London Bridge: The keys to opening capacity

机译:自治市镇高架桥和伦敦桥:通车能力的关键

获取原文
获取原文并翻译 | 示例

摘要

The key to fulfilling the full potential of the Thameslink project involves a massive rebuilding project at London Bridge.rnIn simple terms the Thameslink project is about delivering two things: longer trains, and more of them. The work being done at Blackfriars, Farringdon and the outer stations is mainly designed to facilitate the arrival of the longer, 12-car trains. But there is one big hurdle to overcome before trains can run at the desired frequency -London Bridge station, which represents a major bottleneck in the system.
机译:充分发挥Thameslink项目潜力的关键在于在伦敦桥进行大规模的重建项目。简单来说,Thameslink项目是要交付两件事:更长的火车,以及更多的火车。在Blackfriars,Farringdon和外围车站所做的工作主要是为了方便较长的12车厢列车的到达。但是,在火车能够以所需的频率运行之前,还有一个大障碍需要克服-伦敦桥车站,这是系统中的主要瓶颈。

著录项

  • 来源
    《New civil engineer》 |2010年第9期|P.a14-a17|共4页
  • 作者

    Margo Cole;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号