首页> 外文期刊>New civil engineer >Connecting pin failure suspected in Delhi bridge collapse
【24h】

Connecting pin failure suspected in Delhi bridge collapse

机译:德里桥倒塌涉嫌连接销故障

获取原文
获取原文并翻译 | 示例
           

摘要

Investigators were this week focusing on whether a failed steel connection triggered a footbridge collapse in New Delhi last week, injuring 23 people (News last week).rnThe 100m long footbridge was to connect a car park to the main Jawaharlal Nehru stadium and was due to be opened for Commonwealth Games, which start on Sunday.rnThe bow string arch bridge collapsed as labourers were pouring concrete on the deck.rnEngineers said images of the collapse suggested a pin connecting the bridge deck to cable hangers, suspended from the arch, could have snapped.
机译:调查人员本周着眼于上周在新德里发生的钢连接故障是否导致人行天桥倒塌,造成23人受伤(上周新闻)。这座长100m的人行天桥将停车场连接至Jawaharlal Nehru主体育场,原因是工人们在甲板上浇筑混凝土时,弓弦拱桥倒塌了。工程师说倒塌的图像表明,用销钉将桥面甲板和悬挂在拱门上的电缆吊架连接起来可能会抢购。

著录项

  • 来源
    《New civil engineer》 |2010年第30期|p.6|共1页
  • 作者

    Declan Lynch;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号