...
首页> 外文期刊>New civil engineer >Bank Tube upgrade model to be used at Paddington
【24h】

Bank Tube upgrade model to be used at Paddington

机译:帕丁顿将使用Bank Tube升级模型

获取原文
获取原文并翻译 | 示例
           

摘要

London Underground (LU) is pressing ahead with the use of its Innovative Contractor Engagement (ICE) procurement model on two new schemes, NCE can reveal. The pioneering procurement model is to be next used on the £55M project to link Bakerloo Line and Crossrail platforms at Paddington station before then being used on the £250M Holborn station upgrade. Using the ICE model, LU assesses bids on the added value of their proposal, rather than on lowest cost. Bidders are also rewarded for ideas presented at tender stage even if their bid is unsuccessful.
机译:NCE可以透露,伦敦地铁(LU)正在将其创新承包商参与(ICE)采购模型用于两个新计划,以推动这一进程。开拓性的采购模型将在价值5500万英镑的项目中用于连接帕丁顿车站的Bakerloo Line和Crossrail平台,然后再用于价值2.5亿英镑的霍尔本车站升级。 LU使用ICE模型,根据其提案的增值而不是最低成本评估出价。投标人即使在投标阶段提出的想法也能获得奖励。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号