首页> 外文期刊>New civil engineer >Tackling the Severn estuary silt issue
【24h】

Tackling the Severn estuary silt issue

机译:解决塞文河口淤泥问题

获取原文
获取原文并翻译 | 示例
           

摘要

The recent correspondence on silt in the Severn River initiated by Rob Kirby is timely in view of the plan, recently presented in a blaze of publicity, to build a Swansea lagoon along the estuary rather than a barrage across the Severn. While lagoons may be appealing to unduly cautious bureaucrats, short-termist politicians and non-government organisations with little interest in the practicalities of electricity generation, they will be of very limited significance to the nation since a Swansea lagoon would generate only 2.5% of the power of a barrage -while still requiring a concrete wall of at least half the length of a barrage across the river.
机译:鉴于罗伯·柯比(Rob Kirby)发起的关于塞文河淤泥的最新通信是及时的,因为该计划最近被大肆宣传,目的是在河口修建斯旺西泻湖,而不是在塞文河上建造拦河坝。尽管泻湖可能对过度谨慎的官僚,短期政客和非政府组织有吸引力,但对发电的实用性不感兴趣,但它们对国家的意义非常有限,因为斯旺西泻湖仅能产生2.5%的水。拦河坝的威力-同时仍需要至少是拦河坝长度一半的混凝土墙。

著录项

  • 来源
    《New civil engineer》 |2015年第23期|11-11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号