首页> 外文期刊>New civil engineer >PREFAB'S NEW DAWN: WHY OFFSITE MANUFACTURE IS BEING SEEN AS A SOLUTION TO THE UK'S HOUSING CRISIS
【24h】

PREFAB'S NEW DAWN: WHY OFFSITE MANUFACTURE IS BEING SEEN AS A SOLUTION TO THE UK'S HOUSING CRISIS

机译:PREFAB的新曙光:为什么将外地制造视为解决英国住房危机的解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

The UK needs more houses. About 250,000 a year, according to some estimates, to stabilise prices and provide enough affordable homes. But the country only produced 164,000 for 2015/2016, according to the National House Building Council. While part of this failure is down to red tape and the planning system, the recent Farmer Review of the UK Construction Labour Model puts the issue plainly: "Modernise or die". A veteran of the construction industry and head of Cast Consultancy, Mark Farmer says a potential 20%-25% decline in the available labour force within a decade will further damage hopes of hitting any targets, including the government's for 200,000 a year.
机译:英国需要更多房屋。根据一些估计,每年约有25万个稳定价格并提供足够的可负担房屋。但根据国家房屋建筑委员会的数据,该国2015/2016年仅生产了164,000件。虽然部分失败归因于繁琐的手续和计划体系,但最近《英国建筑工人模型》的《农民评论》却明确地指出了这个问题:“现代化或死”。马克·法默(Mark Farmer)是建筑业的资深人士,也是Cast Consultancy的负责人,他说,十年内可用劳动力可能下降20%-25%,这将进一步损害实现任何目标的希望,包括政府每年20万的目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号