...
【24h】

Under busy Kowloon streets

机译:在繁忙的九龙街道下

获取原文
获取原文并翻译 | 示例
           

摘要

Diaphragm wall rigs have sprung up along the busy road in the last 12 months, squeezing themselves between three lanes of traffic, bus stops, schools and shops. Some of the works are also taking place beneath a major flyover. This has been one of the first visible signs that the Shatin to Central Link is moving ahead over the last 12 months. The works on the six lane Ma Tau Wai Road is to create the 300m long Ma Tau Wai Station under the road within diaphragm walls. The need to keep the road open means that contractor Samsung/ Hsin Chong joint venture must form the diaphragm walls on the east side of the road first, before moving across to the west.
机译:在过去的12个月中,沿着这条繁忙的道路突然出现了隔膜墙钻机,它们挤在三个车道,公交车站,学校和商店之间。一些工程也在大型天桥下进行。这是沙田至中环线在过去12个月内一直向前发展的第一个明显迹象。马头围道六车道的工程是在地下连续墙内的道路下创建300m长的马头围站。必须保持道路畅通,这意味着承包商三星/新昌合资企业必须先向道路东侧形成隔膜墙,然后才能向西移动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号