首页> 外文期刊>Nature >ITER keeps eye on prize
【24h】

ITER keeps eye on prize

机译:ITER密切关注奖品

获取原文
获取原文并翻译 | 示例
       

摘要

Delays in the installation of key parts of ITER, a multibillion-euro international nuclear-fusion experiment, are forcing scientists to change ITER'S research programme to focus exclusively on the key goal of generating power by 2028. As a result, much research considered non-essential to the target, including some basic physics and studies of plasmas aimed at better understanding industrial-scale fusion, will be postponed. Nature has learned that the plans form the main thrust of recommendations by a 21-strong expert panel of international plasma scientists and ITER staff, convened to reassess the project's research plan in the light of the construction delays. The plans were discussed this week at a meeting of ITER'S Science and Technology Advisory Committee (STAC). The meeting is the start of a year-long review by ITER to try to keep the experiment on track to generate 500 MW of power from an input of 50 MW by 2028, and so hit its target of attaining the so-called Q ≥ 10, where power output is ten times input or more.
机译:数十亿欧元的国际核聚变实验-国际热核实验堆关键部件的安装延误,迫使科学家们改变国际热核实验堆的研究计划,以专注于到2028年发电的关键目标。结果,很多研究认为该目标必不可少的,包括一些基本物理学和等离子体研究,旨在更好地理解工业规模的聚变。 《自然》获悉,该计划是由21位国际等离子科学家和ITER工作人员组成的专家小组提出建议的主要目标,该小组召集来根据施工延误重新评估该项目的研究计划。 ITER的科学和技术咨询委员会(STAC)在本周的会议上讨论了这些计划。这次会议是ITER进行的为期一年的审查的开始,试图使实验按计划进行,以在2028年之前从50兆瓦的输入中产生500兆瓦的电力,从而实现其所谓的Q≥10 ,其中功率输出是输入的十倍或更多。

著录项

  • 来源
    《Nature》 |2013年第7471期|282-283|共2页
  • 作者

    DECLAN BUTLER;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 02:53:48

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号