I've been project managing the same contract for 18 months. The original start in October 2012 was accompanied by a programme that had the stone contract complete by April 2013. I remember sweating when we signed the contract, thinking this was going to be tough. Three storeys above ground, with eight bathrooms - one in book-matched Onyx - 240m~2 of limestone in the basement corridors, plus kitchens, servants bathrooms, laundry rooms etc, etc. There were also 400m~2 of sub-basement swimming pool walls and floors, with 110m~2 of hand-made mosaics, vanity tops, worktops and carved basins. All in 7 months (less Christmas). And nothing was built for us to measure!
机译:我已经负责18个月的项目管理同一份合同。最初的计划是在2012年10月开始,当时有一个计划在2013年4月之前完成了石料合同。我记得我们在签订合同时满头大汗,以为这会很艰难。地上三层,有八间浴室-一本与书籍相匹配的On玛瑙-地下室走廊中的石灰岩为240m〜2,此外还有厨房,仆人浴室,洗衣房等,还有地下室的游泳池为400m〜2墙壁和地板上有110m〜2手工制作的马赛克,洗手盆台面,工作台面和雕花盆。总共7个月(圣诞节较少)。没有任何东西可供我们测量!

著录项

  • 来源
    《Natural stone specialist 》 |2014年第4期| 6-6| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号