...
【24h】

Tall order

机译:艰巨的任务

获取原文
获取原文并翻译 | 示例
           

摘要

It goes without saying that working atrnheight requires the right equipmentrnbut, when subcontracting is added tornthe mix, communication, price, powerrnand influence play a decisive hand inrnif and how risks are controlled.rnOn building sites, height and other risks can emerge on a daily basis - sometimes instantly. Coordination of work to manage these risks is complicated by the number of different parties involved in a building project, with subcontractors running last in a long line of circumstances and events over which they have very little control.rnAlthough subcontractors tend to be at the end of the line, they are an important part of the construction industry and the Australian economy, so their influence shouldn't be taken for granted. According to ABS statistics, subcontractors account for up to 90 per cent of the work carried out on a construction site and on any given site there can be around 30 different trades involved.
机译:毋庸置疑,高度工作需要正确的设备,但是,当将分包合同添加到混合中时,沟通,价格,权力和影响力将起到决定性的作用,并且如何控制风险。在建筑工地上,高度和其他风险每天都会出现-有时会立即。建筑项目中涉及的不同方数量众多,使得协调管理这些风险的工作变得复杂,分包商在很长的情况和事件中都无法控制,因此只能在很长的一段时期内运行。rn尽管分包商往往处于最后阶段。就其而言,它们是建筑业和澳大利亚经济的重要组成部分,因此不应将其影响视为理所当然。根据获取和惠益分享统计,分包商占建筑工地上工作量的90%,在任何给定工地上,可能涉及大约30种不同行业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号