...
【24h】

LNG

机译:液化天然气

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Shipping Developments: Atrnend-October, world LNGC supply stood at 365 ships of 52.0 million cbm capacity; 34 vessels totalling 4.3 million cbm were on order, including 9 due for delivery by end-year. In the first ten months of 2010, 23 ships of 3.74 million cbm entered service, against 34 units of 6.23 million cbm in the same period of 2009.rnGolar LNG awarded the contract to supply the LNG regasification system for the West Java FSRU project in Indonesia to Hamwor-thy; the system is due to be delivered to Golar by end-2011. It is the third such deal between the two companies. The West Java facility would be Indonesia's first LNG receiving terminal.
机译:航运发展:10月10日在Atrnend,全球LNGC供应量为365艘,船运能力为5200万立方米;已订购了34艘船舶,总计430万立方米,其中9艘将于年底交付。在2010年的前十个月中,有23艘374万立方米的船舶投入使用,而2009年同期为34艘623万立方米的船舶。rnGolar LNG赢得了向印度尼西亚西爪哇FSRU项目提供LNG再气化系统的合同对Hamwor-thy该系统将于2011年底交付给Golar。这是两家公司之间的第三次此类交易。西爪哇省的设施将是印度尼西亚的第一个LNG接收站。

著录项

  • 来源
    《Monthly Shipping Review SSY》 |2010年第12期|p.18-19|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号