首页> 外文期刊>Modern Railways >Network Rail halts Wandsworth Road-Ealing Broadway service
【24h】

Network Rail halts Wandsworth Road-Ealing Broadway service

机译:网络铁路暂停Wandsworth Road-Ealing百老汇服务

获取原文
获取原文并翻译 | 示例
           

摘要

Southern was unable to introduce a planned new service between Wandsworth Road and Ealing Broadway in May after Network Rail refused to grant access rights. Southern had planned to run a return service on Monday to Friday, calling at Kensington Olympia and Shepherd's Bush, as required by the franchise agreement. The service would have kept a passenger train operating over various chords in London which used to be used by Crosscountry services but which have not gone through the statutory closure procedure since the latter services were withdrawn.
机译:在Network Rail拒绝授予访问权限后,南方航空在5月无法在Wandsworth Road和Ealing Broadway之间引入计划中的新服务。南方航空计划按特许经营协议的要求,在周一至周五进行回程服务,分别拜访肯辛顿奥林匹亚和牧羊人的布什。该服务将使一列旅客列车在伦敦的各种弦上运行,这些弦曾经供越野服务使用,但自后者服务撤出以来未经过法定关闭程序。

著录项

  • 来源
    《Modern Railways》 |2010年第741期|P.9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号