首页> 外文期刊>Modern Railways >Freight Performance - ORR tasks operators with solutions
【24h】

Freight Performance - ORR tasks operators with solutions

机译:货运绩效-ORR要求运营商提供解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

Freight has its own performance problems. Network Rail missed its regulatory target by 25% in 2010-11 and is'very likely'to miss it again this year, according to ORR. Delays to freight services attributed to the infrastructure operator have continued to worsen.They are currently running at 4.33 minutes per hundred train kilometres.The CP4 requirement for 2011 -12 was 3.18 minutes, which ORR believes Network Rail is'now unlikely to be able to deliver'. That said, Network Rail and its customers are questioning the measures of freight performance. Joint discussions on possible changes to the freight operators' (FOCs') requirements have produced some revised measures.
机译:货运有其自身的性能问题。据ORR称,Network Rail在2010-11年度未达到其监管目标25%,很可能在今年再次错过。基础设施运营商对货运服务的延误继续加剧,目前运行速度为每百公里火车4.33分钟.2011 -12年的CP4要求为3.18分钟,ORR认为Network Rail现在不太可能做到交付'。也就是说,Network Rail及其客户正在质疑货运绩效的衡量标准。关于货运运营商(FOC)要求可能变更的联合讨论产生了一些修订措施。

著录项

  • 来源
    《Modern Railways》 |2012年第761期|p.34|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号