...
首页> 外文期刊>Modern Railways >GWML ELECTRIFICATION HUNTINGTHE FROGS
【24h】

GWML ELECTRIFICATION HUNTINGTHE FROGS

机译:GWML电气化除尘器

获取原文
获取原文并翻译 | 示例
           

摘要

As you might expect, there has been no official response to last month's comparison of the Great Western main line (GWML) electrification with the 1990s scheme on the East Coast main line (ECML). This showed that the cost per single track km of the current scheme was just under four times that of the British Rail project. However, readers have been forthcoming with information on boiling frog colonies on the GWML as observed from the sharp end. A classic example via a civil engineering chum concerns bridges. For example, it was assumed the bridge substructures and approach embankments would not require major work when decks or arches had to be modified to obtain clearance for the overhead line electrification equipment. But in several cases, redesigning a bridge to current design codes required major strengthening and stabilisation of abutments.
机译:如您所料,对上个月将大西部干线(GWML)电气化与1990年代计划在东海岸干线(ECML)上进行的比较没有官方的回应。这表明,当前方案的每单轨公里成本仅不到英国铁路项目成本的四倍。然而,从尖端观察到,读者已经获得了有关GWML上沸腾的青蛙菌落的信息。土木工程专家的一个典型例子是桥梁。例如,假设当必须对甲板或拱门进行改造以获取架空线电气化设备的间隙时,桥梁的下部结构和引道堤不需要进行大修。但是在某些情况下,重新设计与当前设计规范的桥梁需要大幅度加强和稳定基台。

著录项

  • 来源
    《Modern Railways》 |2015年第805期|30-30|共1页
  • 作者

    Roger Ford;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号