...
首页> 外文期刊>Modern Railways >Post-HS2 timetable must put freight first
【24h】

Post-HS2 timetable must put freight first

机译:HS2后时刻表必须首先放运费

获取原文
获取原文并翻译 | 示例
           

摘要

Rail freight operators and customers have a lot at stake in the development of HS2. The construction of Phase One will be a significant opportunity to use rail freight for outbound tunnelling spoil and inbound materials along the length of the route. Freight operators and materials suppliers are already in advanced discussions to facilitate this, and once the contracts are let, hopefully later this year, we expect to see significant investment in the necessary staff and resources to facilitate the work. It is also expected that rail freight will benefit from the released capacity that HS2 will create south of Birmingham, and latterly Crewe. Although there are numerous aspirations for new services using this space, there remains a good case for additional freight paths in the off-peak, providing much-needed additional capacity for growth.
机译:铁路货运经营者和客户在HS2的发展中有很多股份。第一个阶段的建设将是利用轨道运输的重要机会,沿着路线的长度使用轨道运输。货运经营者和材料供应商已经进行了高级讨论,以促进这一点,一旦合同,希望在今年晚些时候,我们希望看到对必要的员工和资源进行大量投资,以促进工作。还有预计铁路运费将从释放的能力中受益,HS2将在伯明翰南部和后者队列中创建。虽然使用这个空间有许多对新服务的愿望,但仍然有一个很好的案例,以便在非峰值中进行额外的货运路径,为增长提供了许多需要的额外容量。

著录项

  • 来源
    《Modern Railways》 |2019年第7期|20-20|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号