...
首页> 外文期刊>Modern Railways >TRAM-TRAIN WORKS ONTO NR INFRASTRUCTURE
【24h】

TRAM-TRAIN WORKS ONTO NR INFRASTRUCTURE

机译:电车在NR基础设施上的工作

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

THE FIRST Class 399 Sheffield Tram-Train worked onto Network Rail infrastructure in the early hours of 10 May, when set No 399202 became the first light rail vehicle in the UK to work on the national rail network. The move followed the completion of the installation of the overhead wires over theTinsley Chord, connecting the Sheffield Supertram network to the main line, during the weekend of 21/22 April,and the handing over of the chord to Supertram on 8 May. Running under a possession, the tram reached the Magna science park on the outskirts of Rotherham. Further trial runs on the Network Rail section of the line to Rotherham in the early hours of 11 May included the use of DB Cargo locomotive No 66156 to test recovery procedures.
机译:最早的399级谢菲尔德有轨电车在5月10日凌晨投入网络铁路基础设施,当时399202号机组成为英国第一个在国家铁路网络上工作的轻轨车辆。此举是在4月21/22日的周末完成了在Tinsley Chord上架空电线的安装之后,将Sheffield Supertram网络连接到主线之后, r n,并在5月8日将弦移交给了Supertram。 。有轨电车在行进路线下到达罗瑟勒姆郊区的麦格纳科学园。 5月11日凌晨,在通往罗瑟勒姆(Rotherham)的线路的网络铁路部分上进行了进一步的试验,包括使用DB Cargo机车66156号来测试恢复程序。

著录项

  • 来源
    《Modern Railways》 |2018年第6期|79-79|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号