首页> 外文期刊>Modern Materials Handling >Beating the space squeeze
【24h】

Beating the space squeeze

机译:击败太空挤压

获取原文
获取原文并翻译 | 示例
           

摘要

With real estate at a premium and its business growing, Julius Blum maximizes production in Austria with efficient materials handling on several levels. In the U.S., we spread out. In Europe, they move up. And that's exactly what Julius Blum Inc. did at a manufacturing plant in Bregenz, Austria. It even went a little further with that concept. Not only did Blum go up but it also went underground to make maximum use of its real estate. The main plant, which is three stories tall, connects to a two-level plant by a 100-yard long tunnel, explains Wiegbbert Haller, logistic leader.
机译:随着房地产的珍贵和业务的增长,朱利叶斯·布鲁姆(Julius Blum)通过在多个层面上进行有效的物料搬运,使奥地利的生产最大化。在美国,我们分散了。在欧洲,他们上升了。这正是Julius Blum Inc.在奥地利布雷根兹的制造工厂所做的工作。这个概念甚至更进一步。百隆不仅上升了,而且还进入地下以最大程度地利用其房地产。物流主管Wiegbbert Haller解释说,主厂房高3层,通过一条100码长的隧道与两层厂房相连。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号