首页> 外文期刊>The MJ >Changing needs for housing delivery
【24h】

Changing needs for housing delivery

机译:不断变化的住房交付需求

获取原文
获取原文并翻译 | 示例
           

摘要

We stand on the cusp of perhaps the biggest housing crisis in a generation. The Government's own statistics (via the Ministry of Housing, Communities and Local Government's Live Tables 244) tell the story of the devastating impact of market cycles on new-build housing delivery. In 1979 the balance of delivery of 209,460 homes was 57% private enterprise and 35% local authority, with 8% by housing associations. By 1989 we relied on the private sector for 86% of the 179,360 homes that marked peak output pre-1990 recession. By 2007 local authorities were delivering just 0.0014% of new homes. The fragility of this arrangement was highlighted by the 'great recession' of 2008/2009, which swept away a third of SME housebuilders. With further consolidation since, just 10 housebuilders were responsible for 47% of new homes built in the country last year. With 178,800 new homes built in 2019, it is clear we lack the capacity and models to deliver the 300,000 annual output we need, even before we factor in the economic impact of COVID-19, with some commentators predicting at least a 30% reduction in homes delivered next year. In times past, national crisis required great public sector intervention and fortunately, since 2012, resurgent local authorities are already building once again. The University College London research paper Local Authority Direct Delivery in 2019 drew on responses from 142 different councils (40% of England's 353 authorities) of which 69% were directly engaged in housing delivery, with 8,992 homes built by 83 councils.
机译:我们站在一代人中可能是最大的住房危机的尖端。政府自身的统计数据(通过住房,社区和地方政府的现场表格244)讲述了市场周期对新建住房交付的破坏性影响的故事。 1979年,交付209,460家的余额为57%的私营企业和35%的地方当局,房屋协会有8%。到1989年,我们依靠私营部门占179,360所房屋的86%,标志着峰值产量预先衰退。到2007年,地方当局正在达到0.0014%的新房。这种安排的脆弱性被2008/2009的“巨大经济衰退”突出,这席卷了三分之一的中小企业房屋建设。自从进一步巩固以来,只有10家房屋建筑师对去年全国建造的47%的新房负责。有178,800家建于2019年的新房,很清楚我们缺乏提供300,000年度的能力和模型,即使在Covid-19的经济影响之前,也是在Covid-19的经济影响之前,一些评论员预测至少减少30%家庭明年交付。在过去,全国危机需要众多公共部门的干预,幸运的是,自2012年以来,重新应对地方当局已经再次建设了。伦敦大学学院学院研究论文当地当局2019年的直接交付从142个不同的理事会(英国的40%的40%的353名当局)的回复中,其中69%直接从事住房交付,83个理事会建造了8,992名房屋。

著录项

  • 来源
    《The MJ》 |2020年第12期|20-21|共2页
  • 作者

    Mike DeAth;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号