首页> 外文期刊>The MJ >Watchdog Calls For 'clarity' Over Dcrs
【24h】

Watchdog Calls For 'clarity' Over Dcrs

机译:看门狗呼吁对Dcr进行“澄清”

获取原文
获取原文并翻译 | 示例
           

摘要

Spending watchdogs want the Cabinet Office to clarify the future of departmental capability reviews (DCRs), amid concerns that Whitehall could ditch the assessments. The National Audit Office has reported 'a lack of clarity about where the [DCR] programme is going after the second set of reviews'. The Cabinet Office this week confirmed the DCR process would be put on hold for at least two years while Cabinet secretary, Sir Gus O'Donnefl, and his team considered its role. Whitehall commentators are concerned that senior officials, and ministers, may lose interest in the assessments as new service requirements are heaped on to public bodies.
机译:支出监督者希望内阁办公室澄清部门能力审查(DCR)的未来,因为人们担心白厅可能放弃评估。国家审计署报告“在第二套审核之后,[DCR]计划的去向不明确”。内阁办公室本周证实,在内阁秘书古斯·奥唐纳夫爵士和他的团队考虑其作用的同时,DCR程序将至少搁置两年。白厅的评论员担心,随着新的服务要求堆积在公共机构上,高级官员和部长可能会对评估失去兴趣。

著录项

  • 来源
    《The MJ》 |2009年第12期|p.11|共1页
  • 作者

    Mark Conrad;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号