首页> 外文期刊>Minerals & Energy >Is Too Little Transmission Capacity Being Built? - If So, Why?
【24h】

Is Too Little Transmission Capacity Being Built? - If So, Why?

机译:传输容量是否过小? -如果是这样,为什么?

获取原文
获取原文并翻译 | 示例
           

摘要

The important role of transmission system operators (TSOs) in the development of the internal electricity market is the main issue in this paper. The key question is how to get the former national entities to broaden their scope, including the values that trade across former 'closed' borders may realize. Further, the incentives to take an active part in the ongoing structural change concerning generation are discussed: For example, more wind power in the system may require more generation (and transmission capacity in certain areas as well as generation capacity for regulation). On the regulatory side it is reasonable not only to state a supranational goal, but also to follow it with legislation and a European entity empowered to take action furthering the objectives. This paper attempts to emphasize the importance and tools for changing governance, making it aimed at accommodating a path towards a sustainable integrated European electricity market.
机译:传输系统运营商(TSO)在内部电力市场发展中的重要作用是本文的主要问题。关键问题是如何使前国家实体扩大范围,包括跨越前“封闭”边界的贸易价值可能实现。此外,还讨论了积极参与正在进行的与发电有关的结构变化的动机:例如,系统中更多的风能可能需要更多的发电量(某些地区的输电能力以及用于调节的发电量)。在监管方面,不仅要陈述一个超国家的目标,而且要通过立法和一个欧洲实体授权采取行动,以进一步实现目标,这是合理的。本文试图强调改变治理的重要性和工具,使其旨在适应通往可持续的一体化欧洲电力市场的道路。

著录项

  • 来源
    《Minerals & Energy》 |2008年第1期|p.46-54|共9页
  • 作者

    G. Lundberg; M. Nillsson;

  • 作者单位

    Vattenfall AB, Stockholm, Sweden;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 f;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号