首页> 外文期刊>Mine water and the environment >Corrosion Mechanism of the Main Shaft Wall in the Liuyuanzi Coal Mine and Appropriate Countermeasures
【24h】

Corrosion Mechanism of the Main Shaft Wall in the Liuyuanzi Coal Mine and Appropriate Countermeasures

机译:刘园子煤矿主井壁腐蚀机理及对策。

获取原文
获取原文并翻译 | 示例
       

摘要

The concrete wall of the main shaft of the Liuyuanzi coal mine in Gansu Province, China, experienced serious corrosion less than 3 years after its completion. To deal with the issue, we analyzed the quality of the wall percolates and the composition of the corrosive products and observed the concrete's microstructure. The concrete had suffered severe gypsum-expansioninduced damage caused by the high concentration of sulfate ions in the percolates and the loose structure of the concrete. Based on these findings, the water-seepage sites behind the wall were sealed with grout and the concrete wall was coated with silane. Now, 2 years after treatment, no new corrosion damage has been observed. This study provides a reference for prevention and control of similar engineering problems elsewhere.
机译:甘肃省六元子煤矿主轴井的混凝土墙在竣工不到三年的时间内就遭受了严重的腐蚀。为了解决这个问题,我们分析了壁渗滤液的质量和腐蚀性产品的成分,并观察了混凝土的微观结构。由于渗滤液中硫酸根离子的浓度高和混凝土的松散结构,混凝土遭受了石膏膨胀引起的严重破坏。基于这些发现,墙后的渗水部位用水泥浆密封,混凝土墙涂有硅烷。现在,经过2年的处理,没有发现新的腐蚀损坏。这项研究为预防和控制其他地方的类似工程问题提供了参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号