...
首页> 外文期刊>Maritime Journal >Dalby Aire answers call of distant windfarms
【24h】

Dalby Aire answers call of distant windfarms

机译:Dalby Aire回应遥远的风电场的呼唤

获取原文
获取原文并翻译 | 示例

摘要

Alicat workboats has been building windfarm service vessels since Guardian 1 debuted at Seawork in 2009. The Great Yarmouth UK based builder has produced a number of 18m and 20m craft since that time but, noticing the market has changed substantially over the last few years with the trend for windfarms to move ever farther from shore, started looking last summer at designs for a larger vessel. Not only are larger vessels better able to continue working in harsh sea conditions, they also provide greater comfort for their passengers, often technicians with no experience of life at sea.
机译:自从Guardian 1于2009年在Seawork首次亮相以来,Alicat工作船就一直在建造风电场服务船。英国大雅茅斯的建造商自那时以来已经生产了1800万和20m的船艇,但注意到市场在过去几年中发生了巨大变化。风电场向远离海岸移动的趋势从去年夏天开始着眼于设计更大的船只。大型船只不仅能够更好地在恶劣的海况下继续工作,而且还为乘客(通常是没有海上生活经验的技术人员)提供更大的舒适度。

著录项

  • 来源
    《Maritime Journal 》 |2013年第305期| 53-53| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号