...
首页> 外文期刊>Maritime Journal >LARGEST TURBINE EVER PLACED ON A FLOATING FOUNDATION
【24h】

LARGEST TURBINE EVER PLACED ON A FLOATING FOUNDATION

机译:最大的涡轮机曾放在浮动基础上

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This fi rst V164-9.5mW turbine was installed on a PrinciplePower WindFloat platform at the installation harbourin Rotterdam. The Windfl oat platform comprises threevertical concrete cylinders arranged in a triangle withcross bracing connections to create a semi-submersiblestructure. With a rated capacity of 9.525mW, these turbinesare the most powerful ones to be installed on a commercialwind farm anywhere in Europe according to MHI Vestas.They are also the most powerful turbines to be installedon a fl oating platform anywhere in the world, surpassingthe MHI Vestas 8.4mW turbines operating at the Windfl oatAtlantic platform established off shore Portugal.
机译:这一原则上安装了这一第五次v164-9.5mw涡轮机 在安装港口的电力风平台 在鹿特丹。 Windfl Oat平台包括三个 垂直混凝土圆筒在三角形布置 交叉支撑连接以创建半潜水器 结构体。 这些涡轮机的额定容量为9.525mW 是最强大的是在商业上安装的 根据MHI Vestas的欧洲任何地方的风电场。 它们也是要安装的最强大的涡轮机 在世界上任何地方的一个流量平台上,超越 MHI Vestas 8.4MW涡轮机在Windfl Oat操作 大西洋平台成立了葡萄牙岸边。

著录项

  • 来源
    《Maritime Journal》 |2021年第394期|27-27|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号