首页> 外文期刊>HSB International >JUMBO'S FAIRPLAYER LOADS 1200MT VACUUM TOWER
【24h】

JUMBO'S FAIRPLAYER LOADS 1200MT VACUUM TOWER

机译:JUMBO的会展人员可装载1200MT真空塔

获取原文
获取原文并翻译 | 示例
           

摘要

On Wednesday 13-5-2009, Jumbo's mv Fairplayer successfully loaded several heavy lifts in the port of Antwerp, Belgium. Among the cargo were two 625mT coke drums, each 42m long and with a diameter of 10m. The prize lift however was a 1200mT vacuum tower.rnThis giant (50m long, 17m diameter) was safely lifted off its supports (including three self propelled modular trailers), all of which were fastened onto a barge. Barge, trailers and tower were positioned in-between the quayside and the Fairplayer. Prior to the lifting operation all non-essential staff were summoned to leave the heavy lift vessel, thus ensuring a safer working environment for the crane drivers and other specialised heavy lift crew. In about 1.5 hours the tower and its saddles were lifted onto the weather deck, where they were seafastened.
机译:2009年5月13日,星期三,Jumbo的mv Fairplayer MV在比利时安特卫普港成功装载了数台重型电梯。货物中有两个625mT焦炭塔,每个焦塔长42m,直径10m。然而,奖品升降机是一台1200mT的真空塔。这台巨型机器(长50m,直径17m)被安全地从其支撑物上吊起(包括三个自行式模块化拖车),所有这些都被固定在驳船上。驳船,拖车和塔楼位于码头区和Fairplayer之间。在起吊作业之前,所有非必要人员都被召唤离开重型起重船,从而为起重机驾驶员和其他专业的重型起重船员确保了更安全的工作环境。在大约1.5个小时内,将塔架及其鞍座提升到固定在海上的天气甲板上。

著录项

  • 来源
    《HSB International》 |2009年第5期|61-61|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号