首页> 外文期刊>Maritime by Holland magazine >Alewijnse Marine equipment For British offshore wind farm construction
【24h】

Alewijnse Marine equipment For British offshore wind farm construction

机译:Alewijnse船舶设备,用于英国海上风电场建设

获取原文
获取原文并翻译 | 示例
       

摘要

For GeoSea, DEME's water engineering specialist, Alewijnse built two similar QA Bolt Tension Logging systems that have been used in the installation of 56 wind turbines at the Galloper Offshore Wind Farm off the east coast of England. Alewijnse Marine successfully delivered two QA Bolt Tension Logging systems that played an important role in the high-precision installation process for the wind turbines. The systems ensured that each of the 128 large M72 bolts that secure each monopile to its transition piece was fixed at the correct tension and torque.
机译:对于DEME的水工程专家GeoSea,Alewijnse建立了两个类似的QA螺栓张力测井系统,该系统已用于在英格兰东海岸的Galloper海上风电场安装56台风力涡轮机。 Alewijnse Marine成功交付了两个QA螺栓张力测井系统,这些系统在风力涡轮机的高精度安装过程中发挥了重要作用。该系统确保将每个单桩固定到其过渡件的128个大M72螺栓中的每一个都以正确的张力和扭矩固定。

著录项

  • 来源
    《Maritime by Holland magazine》 |2017年第5期|71-71|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:34:03

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号